| We mention indicative reference list of our most important clients and corresponding projects that we have manufactured in the past few years: |
| |
| |
| |
|
|
| CARDICO S.A. |
|
MANUFACTURE OF THE NEW PLANT OF CARDICO INDUSTRY S.A. |
| SALVANOS |
|
ELECTROLOGICAL WORKS IN PART OF M.V. SUBSTATION FOR THE PROJECT: INSTALLATION OF TREATMENT OF SEWAGES & WORKS OF PROCESSED SEWAGES DISPOSAL (LAND & UNDERSEA CHANNEL) OF MUNICIPALITY OF METHONI |
| 'EVANGELISMOS'' GENERAL HOSPITAL OF ATHENS |
|
REPLACEMENT WORKS OF EXISTING METAL FRAMES WITH NEW ALUMINIUM FRAMES IN THE OFFICES OF ADMINISTRATION AND IN THE LECTURE ROOM IN THE 11th FLOOR OF THE HOSPITAL |
| 'EVANGELISMOS'' GENERAL HOSPITAL OF ATHENS |
|
SUPPLY & INSTALLATION OF ESSENTIAL ELECTRIC BENEFITS (CABLES) FOR THE OPERATION OF RET GROUP IN THE NEW BUILDING OF LABORATORIES |
| 'EVANGELISMOS'' GENERAL HOSPITAL OF ATHENS |
|
REPLACEMENT WORKS OF ASBESTOS OF OLD ROOF IN LOFT IN THE 11th FLOOR OF THE HOSPITAL |
| PUBLIC POWER CORPORATION S.A. IN KASTRAKI - STRATOS |
|
DISMANTLING OF OLD M.V. TRANSFORMERS AND ON-LOAD SWITCHES WITH PCB's - SUPPLY & INSTALLATION OF TWO NEW M.V. TRANSFORMERS AND ON-LOAD SWITCHES |
| PUBLIC POWER CORPORATION S.A. IN ALIVERIS |
|
CONSTRUCTION OF SHEDS AND METAL DEPOSIT |
| MUNICIPALITY OF EDIPSO |
|
MANUFACTURE OF M.V. SUBSTATION & PUMP ROOM OF SEWAGES ELEVATION |
| MUNICIPALITY OF CHALKIDA |
|
ASBESTOS ELEMENTS REPLACEMENT IN THE 9th ELEMENTARY SCHOOL OF HALKIDA |
| DIEKAT S.A |
|
MANUFACTURE OF THE NEW PLANT OF KERAKOLL INDUSTRY S.A. |
| DIEKAT S.A. |
|
MANUFACTURE OF CLOSED HOSPITALISATION FULL RECOVERY - RE-ESTABLISHMENT CENTER ''FILOKTITIS'' IN KOROPI |
| ΕΚΑTEL S.A. |
|
REMOVAL OF POWER TRANSFORMERS WITH PCB's, SUPPLY & INSTALLATION OF NEW TRANSFORMERS IN THE PARTICIPIAL FUND OF NAVY |
| ΕΥDAP S.A. |
|
AUTOMATION & TRANSFER SYSTEM OF G.S. LOADS |
| ZEUS S.A. |
|
MANUFACTURE OF NEW MEDIUM VOLTAGE SUBSTATION IN THE PLANT OF ZEUS INDUSTRY S.A. |
| ΑΕGEK-VIOTER-ΑΚTOR-ΕΚΤΕR |
|
MANUFACTURE OF NEW MILITARY HOSPITAL IN THESSALONIKI |
| KOMVOS S.A. |
|
BUILDING OF NATIONAL MEDICAL HELP CENTER |
| VASSILEIOU CRYSTAL Ltd. |
|
ELECTRIC POWER INCREASE IN EXISTING BUILDING WITH THE ADDITION OF NEW CRYSTAL TREATMENT INSTRUMENT |
| KONSTANTINIDIS IORDANIS |
|
MANUFACTURE OF NEW HOTEL IN ATHENS |
| MAROULIS |
|
MANUFACTURE OF NEW M.V. SUBSTATION IN THE BUILDING OF MAROULIS COMPANY |
| ΜΕLKAT |
|
REMOVAL OF POWER TRANSFORMERS WITH PCB's, SUPPLY & INSTALLATION OF NEW TRANSFORMERS IN THE PARTICIPIAL FUND OF CIVIL EMPLOYEES |
| ΝΕΟSET S.A. |
|
MANUFACTURE OF M.V. SUBSTATION 2500 kVA IN THE PLANT OF NEOSET S.A. IN VASILIKO - EVIA |
| XENOS S.A. |
|
MANUFACTURE OF NEW M. V. SUBSTATION IN THE BUILDING OF XENOS S.A. |
| RAILWAYS ORGANISATION OF GREECE |
|
MEDIUM VOLTAGE SUBSTATION |
| PHARMATEN S.A. |
|
MANUFACTURE OF NEW M. V. SUBSTATION IN THE PLANT OF PHARMATEN INDUSTRY S.A. |
| PHARMATEN S.A. |
|
ELECTRIC POWER INCREASE OF SUBSTATION IN PLANT OF PHARMATEN S.A. IN PALLITI, ATTICA |
| FILIANOS S.A. |
|
CONSTRUCTION OF THE NEW INDUSTRIAL UNIT OF THE COMPANY IN CAPANDRITI |
| HALIVOURGIKI S.A. |
|
ELECTRICAL WORKS IN THE S/S OF THE NEW ROLLING MILLS FTP, CCM |
| HALIVOURGIKI S.A. |
|
MANUFACTURE OF SUBSTATION IN THE MESH WAREHOUSE Nr. 3 |
| PREFECTURE OF EVIA |
|
ASBESTOS ELEMENTS REPLACEMENT IN SCHOOLS OF PREFECTURE OF EVIA |
| PREFECTURE OF VIOTIA |
|
ASBESTOS ELEMENTS REPLACEMENT IN 28 SCHOOLS OF PREFECTURE OF VIOTIA |
| PREFECTURE OF KOZANI |
|
ASBESTOS ELEMENTS REPLACEMENT IN SCHOOLS OF MOLOHA, PALEOKASTRO, SIATISTA |
| |
| |
INSTALLED POWER OF OUR EQUIPMENT IN GREECE (from 1997 to today) |
| Cast Resin Transformers (80 - 15.000 kVA): |
2.000.000 kVA |
| Oil Immersed Transformers (50 - 3.150 kVA): |
500.000 kVA |
| Special Transformers (250 - 2.000 kVA): |
150.000 kVA |
| Generating Sets (7,5 - 1.840 kVA): |
600.000 kVA |
| UPS (3 - 1.000 kVA): |
100.000 kVA |
| BUS BARS (400 - 6.300 A): |
200.000 m |
|
| |
PROJECTS - SERVICE - MAINTENANCE |
| M.V. Substations 20 kV: |
15-20 per year |
| Maintenance contracts for M.V. Substations, Gen. Sets: |
150 contracts per year |
| Management of transformers contaminated with PCB's |
15 transformers in annual base |
| Management and installation of electrical equipment |
15 projects in annual base |
| On Load Tap Changers 150 kV |
40 pieces per year |
|
| |
| |
| |
| |